Where Does Del. John McAuliff Stand on Data Centers in Virginia?

Del. John McAuliff, who represents Virginia's House District 30 (western Loudoun and northern Fauquier counties), has made data centers a defining issue of his first term. His position: data centers need real regulation, so the communities hosting them don't absorb the costs to the power grid, drinking water, and farmland while the industry keeps the benefits. "If you're going to come into a community and you're going to take resources out of that community, then you have to be willing to give back to that community," he's said. In his first session, he wrote and passed Virginia's first Tier 4 emissions standard for data center backup generators, was a chief co-patron of new laws on data center siting and high-voltage transmission lines, delivered a new state park at Oak Hill, and secured state funding for a regional groundwater study.

Updated November 11, 2026

Decorative

Explore the Issues

Electrical Substation

How data center growth pushes up the grid costs on ordinary Virginians' energy bills, the fight over the pending $67 billion Dominion-NextEra merger, and what Del. McAuliff has done and is still fighting to change.

River view in loudoun county virginia

The groundwater study he secured for western Loudoun and Fauquier counties, how Virginia regulates data center water use, and what's still ahead.

​​

​

Map of Virginia house district 30, loudoun and fauquier counties

How data centers are affecting western Loudoun and northern Fauquier: proposed transmission lines, the falling water table, and pollution from diesel backup generators, plus what Del. McAuliff is working on next.

Vote symbol

The bills Del. McAuliff introduced and his full, LIS-confirmed floor votes on data center, energy, grid, and water legislation.

​

​

Accomplishments

Predicted noise levels of a single data center facility in loudoun county, Virginia

Del. McAuliff was a chief co-patron of the law that made noise studies mandatory before any Virginia locality approves a large new data center. Under the new siting law, every new data center expected to need 100 megawatts or more must assess its sound impact on homes and schools within 500 feet of its property line, and the power company must disclose, to the extent known and practicable, the substations and transmission voltage needed to serve it. Localities can also require reviews of the effects on water, farmland, parks, historic sites, and forests. His own HB 511 was folded into the law (HB 153), effective July 1, 2026.

Data center diesel generator in Loudoun County Virginia

Del. McAuliff set Virginia's first Tier 4 emissions standard for data center backup generators. DEQ can no longer issue an air permit for a data center unless its backup generators meet Tier 4-level emission limits, the EPA's strictest standard for diesel engines, which sharply cuts the soot and nitrogen oxides they release. The standard applies to every permit application filed on or after July 1, 2026. This was Del. McAuliff's own HB 507, signed into law by Governor Spanberger on April 8, 2026. The State Air Pollution Control Board has since adopted a regulation carrying out the standard, which took effect November 4, 2026.

Loudoun county, Virginia water source map

Del. McAuliff secured $200,000 in the state budget for a Department of Environmental Quality study of groundwater in western Loudoun and Fauquier Counties, where many homes and farms rely on wells. DEQ must track groundwater levels and quality, project future levels, evaluate the effect of rising withdrawals, and evaluate whether the region needs a groundwater management area, then report to the General Assembly by December 31, 2026. The study began as his own bill, HB 501.

Transmission line towers

Del. McAuliff was a chief co-patron of Virginia’s new transmission line siting law (HB 1491), which pushes Dominion’s highest-voltage lines away from homes and schools. For new overhead lines of 500 kilovolts or more, the State Corporation Commission must now prioritize routes whose center line runs more than 150 feet from any home, school, daycare, or house of worship, unless no other practicable alternative exists. The law took effect July 1, 2026.

Oak Hill, future state park in Virginia

Del. McAuliff delivered Oak Hill, President James Monroe's historic Loudoun County home, as Virginia's newest state park, through a budget amendment from Governor Spanberger that the General Assembly approved on June 29, 2026. In his words: "After many years of attempts, I promised to get Oak Hill preserved as a State Park during my first term. After heavily lobbying the Governor, the House and Senate, I made good on that promise in time to celebrate America's 250th Birthday."

What's Next

  • Del. McAuliff is fighting to make data centers pay the full cost of the power and grid they use, instead of passing it on to families and small businesses. In July 2026, the State Corporation Commission directed Dominion to propose a policy requiring new and expanding large customers, such as data centers, to pay up front for the substations and lines built to connect them to the grid, the same principle behind his 2026 bill, HB 503. His plan goes further: data centers would also cover the generation, capacity, fuel, and wholesale power costs their demand creates, bring new renewable energy and storage online, and file decommissioning plans so ratepayers aren’t stuck with the bill if a project closes. In his own words: “So, if 95% [of the infrastructure] is for them, they need to pay 95% of the cost, not just spread it out across everybody else.”

  • Del. McAuliff is pressing the General Assembly to phase out older, dirtier Tier II diesel generators at every data center on a firm timeline, building on the higher standards for new permits he passed in the 2026 session. He’s pushing for cleaner backup power such as battery storage, strict limits on how many hours generators can run and how much they can emit each year, air-quality monitoring near generator clusters, and notice to nearby schools and residents before new permits are issued.

  • ​​​Del. McAuliff is calling for a ban on new data centers in groundwater scarcity areas, as defined by the Department of Environmental Quality, and on prime farmland. Existing data centers would have to publicly report how much water they expect to use and actually use, including seasonal demand and where the water comes from. New projects would need approval from a regional commission after a required environmental review.

  • ​​​​Del. McAuliff is pushing to keep new high-voltage transmission lines from being routed unnecessarily near homes, schools, and childcare centers. Lines would be buried where feasible and otherwise routed along existing utility corridors. Landowners would be fairly compensated when a new line lowers their property's value, not just paid for the land taken.

  • ​​​Del. McAuliff is working to give counties more control over data center development. That means letting counties pause data center approvals through 2030, permanently ending by-right approval of data centers, and banning nondisclosure agreements in negotiations between developers and local governments.

  • Del. McAuliff is urging the General Assembly to extend Virginia’s new energy consumption tax on data centers, permanently end their sales tax break, and bar counties and towns from creating tax breaks of their own.

  • Del. McAuliff is planning to build on his agrivoltaics law by adding tax credits, grant programs, and other incentives to help farmers co-locate solar with crops. At the HB 508 bill-signing, he called the new legal definition an "initial building block" for what's still to come.

  • Del. McAuliff secured $200,000 for a state groundwater study of western Loudoun and Fauquier Counties. After DEQ delivers its report, due December 31, 2026, he plans to use the findings to write legislation that protects the groundwater supply in Loudoun and Fauquier Counties. The Water Use & Review page has more.

See How Del. McAuliff Voted on Data Center and Energy Bills in the 2026 Session

FAQs

Are data centers raising electric bills in Virginia?

Del. McAuliff is working to make data centers pay their full share, because their demand is adding to bills. PJM's independent market monitor estimated that data centers caused 63% of the jump in the region's 2025/26 capacity prices, about $9.3 billion in a single year, and residential electricity prices in Virginia are rising faster than the national average.

Learn more on Energy Bills

Where does Del. John McAuliff stand on data centers in Virginia?

Del. McAuliff believes data centers need real regulation, not a pass on their impact: the industry shouldn't get to keep the benefits while the communities hosting these facilities absorb the costs to the power grid, drinking water, and farmland. In his first session, he introduced his own bills on generator emissions, ratepayer protections, and land and water preservation.

What has Del. McAuliff actually done about data centers?

Del. McAuliff wrote and passed Virginia's first Tier 4 emissions standard for data center backup generators (HB 507), signed into law April 8, 2026. He was a chief co-patron of the law that made noise studies mandatory before a locality approves a new data center expected to need 100 megawatts or more (HB 153, which folded in his own HB 511), and of the law that pushes Dominion's highest-voltage transmission lines away from homes and schools (HB 1491). He secured $200,000 in the state budget for a study of groundwater in western Loudoun and Fauquier Counties, and plans to use the findings to write legislation that protects the supply. He also delivered Oak Hill, President James Monroe's Loudoun County home, as Virginia's newest state park.

What is Del. McAuliff still pushing for?

Del. McAuliff is pushing for new state protections in five areas: energy costs, backup generators, water and farmland, transmission lines, and local control. Data centers should pay the full cost of the power and grid they use, including generation, capacity, and fuel, instead of passing it on to families and small businesses. Older Tier II diesel generators should be phased out at every data center, and new data centers should be banned in groundwater scarcity areas and on prime farmland. New transmission lines shouldn't be routed unnecessarily near homes, schools, and childcare centers, and landowners should be fairly compensated when a new line lowers their property's value, not just paid for the land taken. Counties should be able to pause data center approvals, and by-right approval and nondisclosure agreements between developers and local governments should end. He is also calling for extending the energy consumption tax on data centers, ending their sales tax break, and helping farmers adopt agrivoltaics. After DEQ reports on its groundwater study of Loudoun and Fauquier, he plans to write legislation to protect the groundwater supply.

Why are data centers such a big issue in his district?

Loudoun County overall is now home to well over 200 data centers, the highest concentration in the world. Western Loudoun and northern Fauquier don't have the concentration of data centers that Eastern Loudoun does, but the pressure is high in the district. Residents living next to data centers deal with noise and emissions from diesel backup generators. Data center rezoning applications are coming in, and the region's grid infrastructure is arriving even faster: a new 765-kilovolt line, the proposed Valley North project, would cross northern Loudoun near Lovettsville, and residents there are fighting it over threats to homes, farms, historic land, and property values; Del. McAuliff has pushed for more time for the public to weigh in. Even residents without a transmission line or data center next door feel the industry's growth through their power bills, since some of the cost of new grid infrastructure built to serve data centers elsewhere is paid for by ordinary ratepayers, and high energy demand from data centers drives up rates for all users. The district relies on private wells and small-town water systems. A 2025 study estimated the water table has dropped 10 to 40 feet or more in mapped areas of western Loudoun over several decades, which led Del. McAuliff to secure a state-funded groundwater study.