top of page
John McAuliff Logo

How Has Del. John McAuliff Voted on Data Center and Energy Bills?

Data centers and energy have been central to Del. John McAuliff's work in the General Assembly. In the 2026 legislative session, he introduced seven data center, energy, and water bills of his own, including the Tier 4 emissions standard for data center backup generators, now in law. He was a chief co-patron of eight more and a co-patron of four others. Seven of these 19 bills had bipartisan support, with two of them passing unanimously in the House. ​

Skip to:

Updated November 12, 2026

Data Center and Energy Bills Del. McAuliff Introduced or Co-Patroned in the 2026 Legislative Session

These are the bills related to data centers, energy, transmission lines, and utilities that Del. McAuliff introduced or co-patroned in 2026.
See every bill Del. McAuliff introduced on LIS.

Bill

Subject
Role

Data center generator emissions. Set Virginia's first Tier 4 emissions standard for data center backup generators, signed April 8, 2026, effective July 1, 2026.

Chief Patron

Agrivoltaics definition. Created a legal definition for agrivoltaics (co-locating solar generation with farming, farming prioritized), a building block for future data center-driven solar siting on farmland. Signed by the Governor, with Senate companion SB 340.

Chief Patron

Requires a site assessment and sound-profile study within 500 feet of homes and schools before a data center is approved, plus optional water, farm, park, historic-site, and forest-impact studies. Incorporated into Del. Josh Thomas's HB 153.

Chief Patron

Would have directed DCR to acquire the nearly 1,250-acre Oak Hill Farm, President James Monroe's historic Loudoun County home, as a state park. The outcome was delivered through the state budget instead.

Chief Patron

Groundwater study. Would have directed a DEQ study of the groundwater supply in western Loudoun and Fauquier counties. Its substance and $200,000 in funding were delivered through the state budget.

Chief Patron

Ratepayer protection from data center grid costs. Would bar the SCC from letting utilities pass data center-specific grid infrastructure costs onto general ratepayers.

Chief Patron

Renewable-energy-standard integrity. Would have tightened what counts as a "renewable" source under Virginia's RPS program and let the SCC revoke improperly issued renewable-energy credits.

Chief Patron

Data center site assessments. Before a locality approves a new data center expected to need 100 megawatts or more, the developer must assess its sound impact on homes and schools within 500 feet of its property line, and the power company must report, to the extent known and practicable, the substations and transmission voltage needed to serve it. Localities can also require water, farmland, park, historic-site, and forest reviews. Effective July 1, 2026. Chief patron: Del. Josh Thomas; incorporates Del. McAuliff's HB 511.

Chief Co-Patron

Transmission-line siting opportunities. Directs VDOT to identify siting opportunities for transmission infrastructure. Chief patron: Del. Irene Shin.

Chief Co-Patron

Solar canopies in parking lots. Sets definitions and a delayed effective date for solar canopies built over surface parking areas.

Chief Co-Patron

Fair and Affordable Electric Rates and Reliability Act. Extends Dominion’s and Appalachian Power’s energy assistance and weatherization programs for low-income, elderly, and disabled Virginians through 2038. The final law also directs regulators to take all measures to reasonably ensure that customers using 25 megawatts or more are not subsidized by other customers. Chief patron: Del. Destiny LeVere Bolling.

Chief Co-Patron

Transmission-line siting. For Dominion’s new overhead lines of 500 kilovolts or more, the State Corporation Commission must prioritize routes whose center is more than 150 feet from homes, schools, daycares, and houses of worship, unless no other practicable alternative exists. Effective July 1, 2026. Chief patron: Del. JJ Singh.

Chief Co-Patron

DEQ standby-generator study. Would direct DEQ to study generators used by commercial facilities, complementing his own HB 507. Chief patron: Del. Elizabeth Guzman.

Chief Co-Patron

Conditioning the data center tax exemption on clean energy. Would have required data centers claiming the sales-tax exemption to make clean-energy or efficiency commitments. Chief patron: Del. Rip Sullivan. Passed the House; failed in the Senate.

Chief Co-Patron

Local zoning authority over "high-energy users." Lets localities weigh a data center's grid impact and expected power consumption in zoning decisions before approving a project. Chief patron: Del. JJ Singh.

Chief Co-Patron

Renewable energy portfolio standard; geothermal heating/cooling systems.

Co-Patron

Underground transmission lines pilot program.

Co-Patron

SCC Phase I Utility biennial rate review.

Co-Patron

SCC cost-allocation proceedings for certain electric utilities.

Co-Patron

FAQs

How has Del. John McAuliff voted on data center and energy bills?

Del. John McAuliff has made data centers and energy a focus of his work in the General Assembly. In the 2026 session, he introduced seven data center, energy, and water bills of his own, including the Tier 4 emissions standard for data center backup generators, now in law. He was a chief co-patron of eight more and a co-patron of four others. Seven of these 19 bills had bipartisan support, with two of them passing unanimously in the House. On the floor, he consistently voted for bills aimed at regulating data centers, increasing industry transparency, and protecting ratepayers from grid costs.

Has Del. McAuliff introduced his own data center legislation, or just voted on other people's bills?

Del. McAuliff wrote and passed his own. His HB 507 set Virginia's first Tier 4 emissions standard for data center backup generators, signed into law April 8, 2026. His site-assessment bill, HB 511, became part of Virginia's new data center siting law (HB 153), which requires a sound study before a locality approves a large new data center and lets localities require water and farmland reviews. His groundwater bill, HB 501, became a $200,000 state-funded DEQ study of western Loudoun and Fauquier Counties, and his HB 508 created Virginia's legal definition of agrivoltaics. He was also a chief co-patron of new laws that steer high-voltage transmission lines away from homes and schools (HB 1491) and direct VDOT to find better places to site them (HB 889).

Has Del. McAuliff voted on data center water use?

Yes. Del. McAuliff voted yes on final passage of HB 496 and on every recorded vote on its Senate companion, SB 553. The law requires water suppliers that report to the State Water Control Board to report how much drinking water and, separately, how much reclaimed water they provide to data centers that hold a DEQ air permit, starting January 1, 2027. After his own bill for a groundwater study in western Loudoun and Fauquier Counties (HB 501) did not pass, he still secured $200,000 for the study in the state budget; DEQ’s report is due December 31, 2026. Read more about data centers and water.

Where can I see Delegate McAuliff's complete voting record?

Del. McAuliff's full floor record for the 2026 session is public on the General Assembly's own Legislative Information System (LIS). This page covers the 105 bills on data centers, energy, the grid, and water; his complete unfiltered record, including bills outside that scope, is available directly on LIS.

Full Floor Voting Record on Data Centers, Transmission Lines, Energy, Utilities

Scope: every bill in the 2026 session on data centers, electric utilities, energy, transmission lines, solar, batteries and generators, the grid, or data center water use; 105 bills total

Bill

Subject
Vote

Electric utilities; energy efficiency upgrades, report.

Yes

Income-Qualified Energy Efficiency and Weatherization Task Force; established, report.

Yes

Electric utilities and licensed suppliers of electricity; regional transmission entities.

Final vote: Yes

Electric utility infrastructure; Dept. of Energy and SCC to conduct an analysis, report.

Yes

Waste to Energy Grant Program; established, report.

Yes

Data centers; site assessment, sound profile of the high energy use facility.

Final vote: Yes

Data centers; use of emergency generation unit, disclosure requirements.

Yes

Electric utilities; electric demand flexibility programs, high energy demand customers, report.

Yes

Distributed Energy Resources Task Force; created, membership, reports, sunset.

Final vote: Yes

Data centers; Dept. of Energy to lead efforts to accelerate use of waste heat, report.

Yes

Electric utilities; renewable portfolio standard program, zero-carbon electricity, etc.

Yes

Electric utilities; small portable solar generation devices, local regulation.

Yes

Clean energy and community flood preparedness; market-based trading program.

Yes

Electric utilities; definitions, integrated resource plans, report.

Final vote: Yes

Electric utilities; electric grid utilization metrics; State Corporation Commission.

Yes

Certain data from water users; water use consumption for domestic, etc., purposes, data centers.

Final vote: Yes

Data centers; permit requirements, emission limits for certain engine-generator sets.

Yes

Small renewable energy projects; agrivoltaics definition.

Yes

Tangible personal property tax; classification for electric landscaping equipment.

Yes

Electric cooperatives; virtual power plant program.

Yes

Data centers; certain data from water users, water use consumption.

Yes

Smart Solar Permitting Platform; established, residential solar energy systems.

Final vote: Yes

Data centers; policy of the Commonwealth.

Yes

Renewable energy portfolio standard program; power purchase agreements.

Yes

Electric Utility Regulation, Commission on; renamed Energy Commission of Virginia.

No

Appliance minimum energy and water conservation standards.

Yes

Solar Interconnection Grant Program; established, report, sunset.

Yes

Solar facilities; local regulation, permits, special exceptions.

Yes

Electric utilities; shared solar programs, Phase II Utility.

Yes

Electric utilities; shared solar programs, Phase I Utility.

Yes

Electric utilities; disconnection reports, SCC database, annual summary.

Yes

Electric utilities; Percentage of Income Payment Program, eligibility.

Yes

Transmission lines; VDOT to identify siting opportunities.

Yes

Siting of battery energy storage projects; commercial solar facilities, etc.

Yes

Electric utilities; integrated resource plans; SCC to investigate electric load forecasts.

Final vote: Yes

Electric utility integrated resource planning; energy storage resources.

Yes

Electric utilities; energy storage requirements, model ordinance.

Yes

Retail Sales and Use Tax; exemption for data centers, delayed effective date.

Yes

Electric utilities; SCC to determine max disconnection fees, etc.

Yes

Electric utilities; performance-based regulatory framework.

Yes

Electric utilities; licensed retail suppliers, RPS requirements.

Yes

Motor vehicle sales and use tax; exemption for electric vehicles, etc.

Yes

Electric utilities; pilot program, electric energy conservation, solar generation.

Yes

Electric utilities; comprehensive assessments, surplus interconnection service.

Yes

Working Lands Preservation, Office of; small renewable energy project fees.

Yes

RPS program; energy from geothermal heating/cooling systems, report.

Yes

Electric utilities; duty to furnish adequate service, high-demand customers.

Yes

Electric substation construction agreements; cooperative definitions.

Yes

Transportation electrification; integrated resource planning, fast-charging stations.

Yes

Land development; solar canopies in surface parking areas.

Yes

Net energy metering; standby charge, facility capacity.

Yes

Electric utilities; purchased power cost risk mitigation practices.

Yes

Investor-owned electric utilities; fuel factor proceedings with SCC.

Yes

Electric utilities; pilot program, energy assistance/weatherization.

Final passage: Yes;
No to some amendments

Contractors; regulation, solar installation companies.

Final vote: Yes

Virginia Clean Energy Innovation Bank; created, report, membership.

Yes

Electric utilities; virtual power plant pilot program, Phase I.

Yes

Underground transmission lines; pilot program, clarifies qualifying projects.

Final vote: Yes

Electric utilities; construction of new overhead transmission lines, siting requirements.

Yes

Standby generators; DEQ study of generators used by commercial facilities.

Yes

Income-Qualified Energy Efficiency and Weatherization Task Force.

Yes

Land development; solar canopies in surface parking areas.

Yes

Demand response programs; evaluation by Dept. of Energy, report.

Yes

Electric utilities; energy efficiency upgrades, report.

Yes

Data centers; site assessment, sound profile of the high energy use facility (Senate companion to HB 153).

Yes

RPS program; power purchase agreements.

Yes

Distributed Energy Resources Task Force.

Yes

Virginia Clean Energy Innovation Bank.

Yes

Electric utilities; integrated resource plans, report.

Yes

Electric utilities; small portable solar generation devices.

Yes

Electric utilities; performance-based regulatory framework.

Yes

RPS program; geothermal heating/cooling, report.

Yes

Electric utilities; pilot programs, energy assistance/weatherization (Senate companion to HB 1393).

Yes

Electric utilities; shared solar programs, Phase II Utility.

Yes

Electric utilities; shared solar programs, Phase I Utility.

Yes

Appliance minimum energy and water conservation standards.

Yes

Electric utility infrastructure; comprehensive analysis, report.

Yes

Landlord & Tenant Act; submetering, energy allocation, ratio utility billing.

Yes

Electric utilities; pilot program, electric energy conservation, solar generation.

Yes

Small renewable energy projects; agrivoltaics definition.

Yes

Solar facilities; local regulation, permits, special exceptions.

Yes

Electric utilities; demand flexibility programs, high energy demand customers.

Yes

Electric substation construction agreements.

Yes

Smart Solar Permitting Platform.

Yes

Transportation electrification; integrated resource planning.

Yes

Electric utilities; duty to furnish adequate service, high-demand customers.

Yes

Siting of battery energy storage projects.

Yes

Electric utilities; energy storage requirements, model ordinance.

Yes

Electric cooperatives; virtual power plant program.

Yes

Transmission lines; VDOT to identify siting opportunities.

Yes

Electric utilities; purchased power cost risk mitigation practices.

Yes

Electric utilities; comprehensive assessments, surplus interconnection service.

Yes

Electric Utility Regulation, Commission on; renamed (Senate version of HB 633).

Yes

Electric utilities; disconnection reports, SCC database.

Yes

Certain data from water users; water use consumption, data centers (Senate companion to HB 496).

Yes

Electric utilities; RPS program, zero-carbon electricity.

Yes

Electric utilities; electric grid utilization metrics.

Yes

Air Pollution Control Board; small renewable energy projects, anaerobic tech.

Yes

Underground electric transmission improvement; levy on utility customers.

Yes

Solar Interconnection Grant Program.

Yes

Electric utilities and licensed suppliers; regional transmission entities (Senate companion to HB 84).

Yes

Clean energy and community flood preparedness; market-based trading program.

Yes

Electric utilities; licensed retail suppliers, RPS requirements.

Yes

Contractors; solar installation companies.

Yes

Underground transmission lines; pilot program (Senate companion to HB 1487).

Yes

“Final vote: Yes” means he voted yes on final passage after voting no on an earlier procedural vote

His complete record is public at LIS's Member Vote Search.